status
Project Status Board
One card per project: what it is, its current stage, the latest milestone, and the next step. Every card carries a data-as-of date; past 14 days without re-verification it is flagged automatically, and past 30 days it moves into the historical entries below. Stale status never poses as fresh.
A verifiable workbench for real-estate deal sourcing, decisioning, and reconciliation — designed, built, and run by the founder as a working N=1 showcase.
Latest milestoneInstitutional underwriting is live in production: lease-by-lease and unit-mix (multifamily) monthly cash flows, floating-rate debt, an annual or monthly LP / GP waterfall (catch-up, clawback), and exports of a formula-linked Excel model and an institutional IC memo 2026-10-24
Next stepShip the next batch: development projects and construction loans, mezzanine and refinancing, Google sign-in (card follows the measured production reading after deploy)
Data as of 2026-10-24
Code translation with a verifiable-confidence engine: 45 programming languages (code→code / natural language→code / code→natural language), with sandbox dual-execution verification and hash-chained receipts. Input is pasted text, up to 200 KB per job; no file upload, no URL translation, and no natural-language document translation.
Latest milestoneProduct reality audit and site renaming completed: positioning rewritten to match the product — code translation plus a verifiable-confidence engine; security headers converged with the main site (2026-10-19) 2026-10-20
Next stepProduction reliability work (moving off the single free-tier route, from the 2026-10-24 window); domain moves to translator.vertciti.com (2026-10-24)
Data as of 2026-10-20
Self-hosted, MIT-licensed listening: four-level verdicts with the rules published, evidence quality scored separately, verifiable verdict receipts, graded alerts (Feishu / DingTalk / WeCom / Slack / email) and a 7-tool MCP server.
Latest milestoneMention detail page (full text, why the sentiment, history) and saved filter views live; demo data refreshes daily (try it, no sign-in) 2026-10-22
Next stepSource repository goes public (after GitHub clears historical references; date TBD)
Private beta: the online demo is a sandbox with a private copy per visitor (authors pseudonymized; 3 live searches per visitor, scheduled collection, delivery and user management off; cleared after 6 idle hours); no customer data and no performance claims yet.
Data as of 2026-10-22
Entering international standards bodies as a company (3GPP / ISO tracks in progress), building a verifiable record of participation.
Latest milestoneJoining-path map for six standards bodies finalized; participation outreach launched 2026-10-19
Next stepAdvance the CGI-MP membership application and the ANSI expert-seat (ISO/TC 309) inquiry (date TBD)
Data as of 2026-10-19
Publishing the operating evidence of a one-person company as signed, public research — starting from questions nobody has studied yet.
Latest milestoneSigned research-report line launched; first flagship report scoped (AI-native organization governance) 2026-10-17
Next stepPublish the first flagship report (date TBD)
Data as of 2026-10-19
A public showroom of one person running a whole company with an AI fleet — fully logged, open to verification.
Latest milestoneMulti-page site restructure shipped (40 bilingual pages); performance-monitoring loop closed the same day 2026-10-19
Next stepFirst read of real-visitor performance data; quarterly hard-test review (date TBD)
Build log25 entries · last updated 2026-10-19
Data as of 2026-10-19
An operations system for real-estate disposition work
Latest milestoneCleared compliance review; first listed on this page 2026-10-19
Next stepStatus reviewed weekly (date TBD)
In development — built for our own real-estate operations; not yet offered externally, and not a product or service offering.
Data as of 2026-10-19
Historical entries
No historical entries yet.